Commit Graph

9 Commits

Author SHA1 Message Date
RodZill4
f07e4475a2 JSON files are now pretty-printed 2019-10-27 14:36:16 +01:00
RodZill4
4fc7c11a29 Updated size parameter handling and resized all examples to 2048x2048
Also added a base class for all graph nodes, fixed issues with graph/remote interactions.
2019-10-21 23:58:14 +02:00
RodZill4
d3e34d42cb Updated examples and added new ones 2019-10-18 08:36:25 +02:00
RodZill4
3bb9dd50db Generic node updates
- Added support for inputs and alternate syntax for parameters ($foo instead of $(foo))
- Added support for default input values ($uv can be used for non uniform defaults)
2018-11-19 23:09:22 +01:00
Rodolphe Suescun
6ca982b692 Slightly modified the ptex file format
Parameters are now saved separately from other node attributes (type, name...). Old files can still be loaded.
2018-11-03 18:56:58 +01:00
RodZill4
4ca96b5d8e Updated examples 2018-09-11 19:40:34 +02:00
RodZill4
cb03131b85 Added control link check and editable labels
Now linking new controls to a linked_control will check compatibility (same control type and parameters).
Linked control labels are now editable.
Modified the Switch node layout so it is easier to understand.
Updated the bricks example to use the switch and remote nodes.
2018-09-10 08:00:03 +02:00
RodZill4
95a737029a Started adding the "remote node"
Started adding the "remote" node, that can control important parameters of the graph and save/restore configurations of groups of parameters. This should help creating easily configurable materials.

Added new "mosaic" example
2018-09-08 12:25:28 +02:00
RodZill4
1c56fc60d8 Cleanup and renaming
Moved Material Spray to another repository.
Renamed the addon directory to material_maker
2018-09-03 21:35:44 +02:00